The Local Roads and Drainage Programme is described as Qatar’s nationwide programme that includes the development of roads, drainage, and associated infrastructure. The programme addresses the all five subdivisions of the country as part of implementing Qatar 2020 Vision.
The programme estimated cost is + 14 Billion USD and expected to be delivered by 2019.

General Engineering Consultant:: WS Atkins

SD Group Involvement:
• Infrastructure Design
• Design Project Management
• Cost Management
• Claims Identification
• Claims Value Assessment
• Claims Preparation & Presentation

Local Roads and Drainage Programme
Date

January 14, 2015

Client

Public Works Authority (PWA), Qatar

Category

SD PM